Project Manager

I was Project Manager for several geotechnical projects.

2002 – 2007 – Golder Associates (Italy)

  • 20th Winter Olympic Games Turin 2006 (Piemonte, Italy): Geological , geotechnical and environmental assessment for the design of programmed snow production and construction design of the Free Style ski run.

  • Construction Design of Lining Rehabilitation (Autocamionale della Cisa, Parma, Italy): 3D Analysis for the simulation of demolition and reconstruction of damaged tunnel lining of A15 Highway Tunnel (Valico); Construction Design of Lining Rehabilitation

  • Real Time Monitoring System (San Ruffillo, Bologna, Italy). Design and management of real time monitoring system of the railway tracks during excavation of underground twin tunnels for high speed velocity trains.

  • Parking Design. Geotechnical finite elements analysis for underground parking construction and nearby buildings.